SDC

Projects

Creating inspiring spaces through innovative design and construction

Central Spaces
20.01.2025

Central Spaces

This project provides modern and integrated facilities for St Catherine's College.

Beech Court
20.01.2025

Beech Court

This project for Abingdon School provided space for the sixth form and art department.

Kimbolton Prep School
20.01.2025

Kimbolton Prep School

This project involved the refurbishment and extension of Kimbolton Preparatory School.

Aston Martin Wind Tunnel
20.01.2025

Aston Martin Wind Tunnel

This ongoing scheme will provide a world-renowned formula one client with a new, state-of-the-art wind tunnel vehicle testing facility.

Building 2
20.01.2025

Building 2

Building 2 forms a pivotal component of Aston Martin’s state-of-the-art AMR Technology Campus, enhancing the site's redevelopment.

Project Atlantis
18.12.2024

Project Atlantis

This scheme for Center Parcs in Sherwood included the installation of the Tropical Cyclone water ride, the largest interactive four-person raft ride in Europe.

1000 Discovery Drive
20.01.2025

1000 Discovery Drive

A versatile five-storey multi-occupancy structure, offering approximately 105,000 square feet of office and B1(b) laboratory space within the Cambridge Biomedical Campus.

Sherard Building Refurbishment
07.11.2024

Sherard Building Refurbishment

Located on the Oxford Science Park, the Sherard Building accommodates four storeys of offices and laboratory space.

University Sports Centre
07.11.2024

University Sports Centre

The University Sports Centre in West Cambridge was instrumental in enhancing the University of Cambridge’s sporting infrastructure.

People Performance Centre
07.11.2024

People Performance Centre

The People Performance Centre is a state-of-the-art fitness centre at Mercedes facility in Brixworth.

Westway Place Student Accommodation and Mixed Use
06.11.2024

Westway Place Student Accommodation and Mixed Use

This block provides one-hundred and eighteen studio apartments for Oxford Brookes University students.

29.10.2024

Uppingham Cricket Pavilion

The historic cricket pavilion, built in 1923, underwent refurbishment to repair and reinvigorate.

One Granta
29.10.2024

One Granta

One Granta represents a pioneering venture, boasting a cutting-edge speculative laboratory and office edifice.

Lucy Cavendish College
11.12.2024

Lucy Cavendish College

This scheme provides 72 eco-friendly and modern en-suite bedrooms for students studying at Lucy Cavendish College.

Project Atria
28.10.2024

Project Atria

Stands as a beacon of innovation on the Cambridge Biomedical Campus.

Project Birchwood
28.10.2024

Project Birchwood

Located next to the Melbourn Science Park, this large-scale development provides technology consultants TTP with three new state-of-the-art buildings.

Simon Sainsbury Centre
28.10.2024

Simon Sainsbury Centre

This project involved a four storey extension to the old Addenbrooke’s Hospital Building in the heart of Cambridge.